The Magnum Long Lead Edc Is A Classic Gentleman’S And Gourmet Pocket Knife For Everyday Use. Its Simple, Slightly Curved Design Is Instantly Appealing. The No-Frills Design Also Corresponds To Its Technical Construction As A Slip-Joint Knife, Which Has Proven Itself A Million Times Over Thanks To Its Ease Of Use And Fewer Components. The Satin-Finished Blade Made Of 440B Stainless Steel Is Flat-Ground, Is Opened By Nail Nick And Does Not Lock. The Lightly Contoured Handle Scales Made Of Textured G10 Fit Comfortably In The Hand. With Clip (Tip-Down/R).
Long Lead Edc
$37.34 Original price was: $37.34.$27.99Current price is: $27.99.
SKU: SKUcfc94525fb4cf7b8a4f78b4e75327039 Categories: Edc Knives, Pocket Knives Tag: Magnum Brand: Magnum
Be the first to review “Long Lead Edc” Cancel reply
Related products
Sale!
Pocket Knives
Pocket Knives
$134.89
Sale!
Pocket Knives
Pocket Knives
$130.89
Pocket Knives
$134.99
Pocket Knives
$126.99
Pocket Knives
$128.99
Sale!
Pocket Knives
Sale!
Pocket Knives
Pocket Knives
$13.99
Sale!
Pocket Knives
Sale!
Pocket Knives
Sale!
Pocket Knives
Sale!
Pocket Knives
Pocket Knives
$132.89
Pocket Knives
$120.89
















Reviews
There are no reviews yet.